10th of Ramadan
As a key element the NAT’s (the National Tunnel Authority emanating from the Egyptian Ministry of Transport and owner of the Cairo metro network) integrated multimodal transport strategy, the LRT (electric train) line is connected to Line 3 of the Cairo metro, already operated by RATP Dev, at Adly Mansour station. Interconnecting Line 3 with other metro lines will allow Cairo metropolitan residents and visitors to conveniently reach the New Administrative Capital.